Page 439 - 2025 Los Angeles Angels Media Guide
P. 439
TEMPE DIABLO STADIUM
SPRING TRAINING
TEMPE DIABLO RENOVATIONS
Through the combined efforts of the
Angels and the City of Tempe, the
Tempe Diablo Spring Training site
underwent major renovations during
the 2024-25 offseason to improve
team experiences and performance. In
February 2025, the Angels debuted the
newly renovated and expanded Player
Development Center.
The updated facility features a
new Performance Center, Players’
Clubhouse, Coaches Locker Room,
Video Room, Women’s Locker Room,
Coaches Workroom and a full kitchen
with dining space for players and staff. In
addition, renovations included a new Weight
Room featuring the latest gym equipment,
a newly outfitted Athletic Training Room, a
Hydrotherapy Room with all new equipment
and technology, Medical Exam Rooms and new
office space for the Angels Sports Performance
staff.
The entire facility has also undergone
modernizing design updates, including the
instillation of new lighting, fixtures and
furniture throughout the building.
As part of the advancements, the new
Performance Center will feature four updated batting cages with a full fleet of technological additions to benefit
both the pitching and hitting departments. The Center’s new retractable netting system will allow the Club
options to utilize the space for a variety
of needs. The indoor, climate-controlled
center and newly constructed Weight
Room are set alongside a new 300-foot-
long agility field for easily accessible use
by players, Sports Performance staff and
on-field coaches. After completing the
renovation, the Player Development
Center has more than doubled in size,
from a total 22,100 square feet to 46,141
square feet. The developments come as
part of an agreement between the Angels
and the City of Tempe to extend Tempe
Diablo as the Angels Spring Training home
through 2035.
SPRING TRAINING
ANGELS.COM /ANGELS @ANGELS 475