Page 451 - 2026 Los Angeles Angels Media Guide
P. 451

T empe D iablo Stadium
        Tempe Diablo Stadium
        SPRING TRAINING                            2026



                         2025 TEMPE DIABLO RENOVATIONS

          Through the combined efforts
      of the Angels and the City of Tempe,
      the Tempe Diablo Spring Training site
      underwent major renovations during
      the 2024-25 offseason to improve
      team experiences and performance.
      In February 2025, the Angels debuted
      the newly renovated and expanded
      Player Development Center.
           The updated facility features
      a new Performance Center, Players’
      Clubhouse, Coaches Locker Room,
      Video Room, Women’s Locker Room,
      Coaches Workroom and a full kitchen with dining space for players and staff. In addition, renovations
                                          included a new Weight Room featuring the
                                          latest gym equipment, a newly outfitted Athletic
                                          Training Room, a Hydrotherapy Room with all
                                          new equipment and technology, Medical Exam
                                          Rooms and new office space for the Angels Sports
                                          Performance staff.
                                           The entire facility has also undergone
                                          modernizing design updates, including the
                                          instillation of new lighting, fixtures and furniture
                                          throughout the building.
                                           As part of the advancements, the new
                                          Performance Center feature four updated batting
      cages with a full fleet of technological additions to benefit both the pitching and hitting departments. The
      Center’s retractable netting system allow the Club options to utilize the space for a variety of needs. The
      indoor, climate-controlled center and
      newly constructed Weight Room are
      set alongside a new 300-foot-long
      agility field for easily accessible use by
      players, Sports Performance staff and
      on-field coaches. After completing the
      renovation, the Player Development
      Center more than doubled in size, from
      a total 22,100 square feet to 46,141
      square feet. The developments came
      as part of an agreement between the
      Angels and the City of Tempe to extend
      Tempe Diablo as the Angels Spring
      Training home through 2035.

                                                                             SPRING  TRAINING

                         ANGELS.COM     /ANGELS       @ANGELS      485
   446   447   448   449   450   451   452   453   454   455   456